Location: Akron Lumber, Akron
0 $0.00
items in your cartto quote To cart
Ooops no items were found.
Try something else.
Ok
Loading…

CPVC

42 items found
Sort by
Pipe Tee, Nominal Size: 1/2 in, Operating Temperature: 180 deg F, Schedule Rating: SCH 40, CPVC
Pipe Tee, 3/4 in, CPVC, SCH 40 Schedule
Pipe Cap, 1/2 in, CPVC, SCH 40 Schedule
Pipe Cap, 3/4 in, CPVC, SCH 40 Schedule
Pipe Bushing, 3/4 x 1/2 in, CPVC, 40 Schedule
Street Pipe Elbow, 3/4 in, 90 deg Angle, CPVC, 40 Schedule
Pipe Tee, 3/4 x 1/2 in, CPVC, SCH 40 Schedule
Pipe Tee, 3/4 x 1/2 in, CPVC, SCH 40 Schedule
Street Pipe Elbow, 1/2 in, 90 deg Angle, CPVC, 40 Schedule
Transition Pipe Adapter, 3/4 in, Solvent x FIP, Brass/CPVC
Pipe Adapter, 1/2 in, Slip x FIP, CPVC
Pipe Adapter, 3/4 in, Slip x FIP, CPVC
Pipe Coupling, 3/4 in, CPVC, SCH 40 Schedule
Drop Ear Pipe Elbow, 1/2 in, FIP x Solvent, 90 deg Angle, Brass/CPVC
Solvent Cement, 8 oz Can, Liquid, Yellow
16-1/2 in x 48 in x 19-3/4 in Water Softener and Filter
1/2 in Valve Stop-Waste, CPVC
Pipe, 1 in, 10 ft L, Plain, CPVC
Total 42 products
SEARCH ×